Citation Aircraft:
SL525C-27-05 – Flight Controls – Ground Spoiler Ultrasonic Inspection (525C) – Compliance: M – Date: 10/25/2014
SB560-33-33R1 – LED Replacement Light for Wing Landing/Taxi Light Assembly (560-Ultra, Encore, Encore+) – Compliance: O – Date: 09/26/2014
SB525-26-02 – Fire Protection – EASE Fire Bottle Identification Sleeve Installation (M2) – Compliance: O – Date: 09/30/2014
SL525C-27-03 – Flight Controls – Ground Spoiler Panel Inspection (525C) – Compliance: M – Date: 10/03/2014
SB750-25-39 – Equipment/Furnishings – Aft Closet Door Hinge Replacement (750) – Compliance: O – Date: 10/15/2014
SL560-54-01 – Nacelles/Pylons – Pylon Drain Hole Inspection (Encore, Encore+) – Compliance: R – Date: 10/16/2014
Propeller Aircraft:
SEL-20-01R1 – Standard Practices – Listing of Nondestructive Testing Facilities (120 through T240, 300, 350 & 400) – Compliance: I – Date: 10/22/2014
SB560-33-33R1 – LED Replacement Light for Wing Landing/Taxi Light Assembly (560-Ultra, Encore, Encore+) – Compliance: O – Date: 09/26/2014
SB525-26-02 – Fire Protection – EASE Fire Bottle Identification Sleeve Installation (M2) – Compliance: O – Date: 09/30/2014
SL525C-27-03 – Flight Controls – Ground Spoiler Panel Inspection (525C) – Compliance: M – Date: 10/03/2014
SB750-25-39 – Equipment/Furnishings – Aft Closet Door Hinge Replacement (750) – Compliance: O – Date: 10/15/2014
SL560-54-01 – Nacelles/Pylons – Pylon Drain Hole Inspection (Encore, Encore+) – Compliance: R – Date: 10/16/2014
CAB-30-05 – Ice & Rain Protection – Single Filter Element for TKS Aircraft (208B) – Compliance: O – Date: 10/03/2014
CAL-05-01 – Time Limits/Maint. Checks – Task Based Inspection Program (208, 208B) – Compliance: I – Date: 10/03/2014
SB11-73-01 – Intake Valve Inspection for Date Stamp (206H, T206H) – Compliance: M – Date: 09/30/2014
SEL-71-03 – Power Plant – Air/Oil Separator Drain Line Inspection (T240) – Compliance: M – Date: 10/01/2014
SEL-20-01 – Standard Practices – Listing of Nondestructive Testing Facilities(100 and 200 Series Aircraft, 300, 350, 400 and T240) – Compliance: I – Date: 10/07/2014
MEL-20-01 – Standard Practices – Listing of Nondestructive Testing Facilities(300 and 400 Series Aircraft) – Compliance: I – Date: 10/07/2014
CAL-20-01 – Standard Practices – Listing of Nondestructive Testing Facilities(208, 208B) – Compliance: I – Date: 10/07/2014
CQL-20-01 – Standard Practices – Listing of Nondestructive Testing Facilities(425 and 441) – Compliance: I – Date: 10/07/2014
SEB-24-01 – Electrical Power – Transmittal of Lamar Technologies LLC Service Intro Letter(172R, 172S,182T, T182T, 206H, T206H) – Compliance: M – Date: 10/07/2014
SEB-24-02 – Electrical Power – Transmittal of Lamar Technologies LLC Service Intro Letter(172R, 172S, 182S, 182T, T182T, 206H, T206H) – Compliance: M – Date: 10/07/2014
SB00-24-01R1 – Main Power Junction Box Circuit Breaker Retrofit Kit Installation(172R, 172S, 182S, 206H, T206H) – Compliance: R – Date: 10/07/2014
CQL-71-03 – Transmittal of Pratt & Whitney Canada S.I.L. No. PT6A-221 (425) – Compliance: I – Date: 10/15/2014